Lighting Study of a 33kV Switchroom

A lighting study was conducted for the internal and external areas of the 33kV switchroom, covering both emergency lighting and escape routes
Tronox Case Study

Tronox Australia is a global vertical integrated producer of titanium dioxide and inorganic chemicals. Tronox refines and processes titanium ore, zircon and other materials. PROJECT: Constructing and assembling 6.6kV switchboard & switch-room with site installation of electrical works.
Kiosk with RMU, Transformer and Low Voltage

transformer layout low voltage
Exmouth Power Station

7x Caterpillar G3516 TA (980kW p.u.) dual fuel CNG / LPG custom generator sets with local control panels and gas trains. RESPONSIBILITIES Design Engine and Generator Installation Modification Control Panel Assembly and Electrical Equipment Supply Factory Acceptance Testing Site Acceptance Testing Project Management Senior Project Engineering Contract Administration Quality and Document Control
RMU Enclosures

Eaton RMU Enclosures
West Kimberly Power Project

Power Generation Perth Western Australia Avid Group The $320 million West Kimberley Power Project (WKPP) comprises five power stations – four fueled by LNG – and the LNG plant at Karratha and associated road transport infrastructure. With an initial generating capacity of 61 MW (multiple Caterpillar G3520C, G3516C and G3412 enclosed island mode gas
Harriet Alpha Platform

1x Caterpillar G3512 DITA (794bkW p.u.) natural gas generator with stainless steel cyclone proof enclosure, two custom free standing stainless steel cyclone proof IP66 control panels (one for new generator and one for existing) and additional upgrade of existing generator control systems. Petroleum application. RESPONSIBILITIES Design Electrical Installation and Equipment Supply Factory Acceptance Testing
low voltage main switchboard

AVID Group has completed a project for APA – gas compressor application
Ocean Legendre Platform

1x Caterpillar 3406 DITA (400kW p.u.) enclosed essential diesel generator package. Petroleum application. RESPONSIBILTIES Feasibility Study
Phase V North West Shelf LNG Expansion

Emergency Diesel Generators. 1 x Caterpillar 3516B HD DITA (2000kW p.u.) and 1 x Caterpillar C18 (560kW p.u.) enclosed emergency diesel generator packages with custom local and remote control panels. Petroleum application. RESPONSIBILITIES Design Electrical Installation and Equipment Supply Factory Acceptance Testing Site Acceptance Testing Project Management Senior Project Engineering Contract Administration Quality