BHP Nickel West Control rooms

AVID Group been engaged by BHP / TransAlta to construct their SCADA Control room at their Leinster and Mt Keith Solar farm respectively.

Premier Coal Kiosk substation design and construct

This project required AVID Group to undertake the design, manufacture and assembly requirements for kiosk, transformer, low voltage Logstrup type tested motor control centres (MCCs) and switchboards for Premier Coal’s Water Treatment Plant Relocation Project. It also covers motor starter panels and distribution boards where applicable. The low voltage motor control centres and switchboards shall […]