Exmouth Power Station

7x Caterpillar G3516 TA (980kW p.u.) dual fuel CNG / LPG custom generator sets with local control panels and gas trains. RESPONSIBILITIES Design Engine and Generator Installation Modification Control Panel Assembly and Electrical Equipment Supply Factory Acceptance Testing Site Acceptance Testing Project Management Senior Project Engineering Contract Administration Quality and Document Control

West Kimberly Power Project

Power Generation Perth Western Australia Avid Group The $320 million West Kimberley Power Project (WKPP) comprises five power stations – four fueled by LNG – and the LNG plant at Karratha and associated road transport infrastructure. With an initial generating capacity of 61 MW (multiple Caterpillar G3520C, G3516C and G3412 enclosed island mode gas