Lycopodium – Liontown switch-rooms
AVID Group been engaged by Lycopodium – Liontown to construct: Crushing MCC and Switchroom Flotation MCC and Switchroom Concentrate & Tailings MCC and Switchroom Reagents & Services MCC and Swithroom Milling and Tantalum Recovery MCC and Switchroom Grinding MCC and Switchroom Tantalum Recovery MCC and Switchroom
Tronox Tails booster skids x4
Scope of works: a) Design and supply of four (4) skid-mounted containerised (20ft), including MCCs and all internal ancillary services including lighting, small power and communications, fire detection and air conditioning; b) Design and supply of seven (7) double-skinned bore pump starter panels; c) Receive to the Contractor’s workshop steel skids, PLCs, VSDs and […]
Marvel Loch switch-room
Iron Ore harmonics filter project
Iron ore harmonic filters project
Northern Kimberly Project – containerised solution
Northern WA 40ft Containerised modified to suite including: 1. electrical design of motor control center with PLC cabinet 2. Installation of fire systems, detection and suppression, fire extinguishers 3. Installation of split type air conditioning (HVAC) system. 4. Commissioning and testing 5. ITP and FAT testing included in AVID Group scope
11kV circuit breaker testing
Action shots Akshay testing an ABB VD4 11kV 1250A Circuit breaker using Omicron Cibano standard set up covering Trip, Close and Under-voltage Coil testing Steve testing a Merlin Gerin MCSet 11kV 1250A Circuit Breaker using the Omicron Cibano with CB MC2 set up covering Trip, Close and Ductor testing.
6.6kV Substation Upgrade
lifting of switchgear cable terminations a proud moment removing old gear Team Work Eaton UX 6.6kV switchgear
Alcoa Low Voltage Motor Control Center X-Energy
low voltage motor control delivery internal module layout
Barring Furnace Panel
Caterpillar 3512
Generator Enclosure Fit Out. 2 x 3512 Caterpillar Generator. Installation of all internal fixtures and fittings in the 2 generator enclosures, including control panel and Circuit breaker panels. A fire protection systems was also installed in both enclosures. RESPONSIBILTIES Electrical and Mechanical Installation Supply of Electrical Equipment Site Commissioning Factory Acceptance Testing Site Acceptance